June 01, 2006

June 5 Workshop Decoupling Spreadsheet

This is the updated PPL case study and forecast simulation spreadsheet that will be referenced at the June 1, 2006 Workshop in Trenton, NJ.

Download spreadsheet here

Posted by rapwayne at 01:55 PM | Comments (0)
Mail to: Wayne Shirley

May 16, 2006
Posted by rapwayne at 09:10 AM | Comments (0)
Mail to: Wayne Shirley

Posted by rapwayne at 09:09 AM | Comments (0)
Mail to: Wayne Shirley

Posted by rapwayne at 09:05 AM | Comments (0)
Mail to: Wayne Shirley

May 01, 2006

PPL Decoupling Case Study Update

This is the latest version of the PPL Decoupling Case Study:
Download case study spreadsheet.

Posted by rapwayne at 02:29 PM | Comments (0)
Mail to: Wayne Shirley

March 22, 2006

March 24 General Meeting -- Decoupling Documents

An updated version of the PPL Decoupling Case Study is now available. You may download the spread sheet and explanaotyr memo here:

Decoupling Memo and Spreadsheet

This document also includes a PDF document which reflects one of the possible scenarios from the spreadsheet.

Posted by rapwayne at 04:11 PM | Comments (0)
Mail to: Wayne Shirley

March 07, 2006

PSE&G Utility Planning Presentation

This is Jim Calore's planning presentation being made a today's MADRI meeting
Planning Presentation

Posted by rapwayne at 10:28 AM | Comments (0)
Mail to: Wayne Shirley

December 19, 2005
Posted by rapwayne at 10:21 AM | Comments (0)
Mail to: Wayne Shirley

December 08, 2005

Regulatory Workgroup Documents for December 12, 2005 MADRI Meeting

The following files have been uploaded the MADRI Weblog:

PPL Rate Rider Case Study
This is an Excel spreadsheet based on actual PPL billing data for the past 12 months. Please note: this spreadsheet uses Visual Basic controls which Excel may flag as "Macros" or as "Activex" controls, depending on your Excel security settings. It is safe to enable these macros and open the file. These controls may not be compatible with the Macintosh version of Excel. If you have difficulty opening the file or operating the controls, please contact Wayne Shirley.

At the December 12 meeting, we will be reviewing the output of this spreadsheet, including what potential issues it raises and what the solutions for those issues might be.

Distribution System Regulation Issue Paper

This is an updated version of the Distribution System Regulation paper presented at the last Regulatory Subgroup meeting. It has some additional text reflecting discussions about the magnitude of potential deferral values for DG. We will be discussing next steps for this topic at the December 12 meeting.

Environmental Principles
This document reflects the statement of principles for environmental standards for distributed generation. It will also be discussed at the December 12 meeting.

Posted by rapwayne at 01:19 PM | Comments (0)
Mail to: Wayne Shirley

November 21, 2005

PJM 1999 Price Distribution Slide

The following file was used for reference during the November 21, 2005 Business Models Subgroup Meeting in Washington, DC

Download file

Posted by rapwayne at 12:32 PM | Comments (0)
Mail to: Wayne Shirley